A 212-page ITT, parsed into a compliance matrix in 89 seconds.
This is a real-shaped sample of the output BidComplete produces when you upload a UK tender pack. No signup needed — scroll through, then try it on one of your own.
How it works
Three steps, no signup.
Walk through what happens when a UK tender pack lands in BidComplete.
Step 1
Drop the tender pack
Upload a PDF, ZIP or Word file — however the buyer sent it. BidComplete previews every page so you know the whole pack is in before AI runs.
- PDF, DOCX, ZIP and password-protected packs supported
- Resumable upload for large multi-hundred-page tenders
- Buyer, reference and deadline auto-detected
ITT-2026-0447-Facilities.pdf
212 pages · 8.4 MB
Ready to analyse
Step 1 of 4
ITT — Managed Facilities Services (Sample)
Sample County Council · ITT/2026-0447
Static preview · not editable
- Pages parsed
- 212
- Parse time
- 89 seconds
- Requirements extracted
- 8
- Deadline
- 12 May 2026, 12:00
Confirmed
3
Evidence already in your library
Drafted
3
AI draft ready for reviewer approval
Gap
1
No evidence found — flagged for action
Compliance matrix
Every mandatory, scored and word-limited requirement — sourced back to the page it came from.
| Ref | Requirement | Type | Weight / limit | Source | Status |
|---|---|---|---|---|---|
| R-01 | ISO 45001 Health & Safety accreditation, valid at submission Section 4.1 · Mandatory | Mandatory | — | p.14 | Confirmed |
| R-02 | Cyber Essentials Plus certificate, no older than 12 months Section 4.1 · Mandatory | Mandatory | — | p.15 | Confirmed |
| R-03 | Minimum three comparable projects delivered in the last five years Section 5.2 · Experience | Scored | weight 20% | p.22 | Drafted |
| R-04 | Response to Question 7 — Social value commitments Section 6 · Social value | Word limit | weight 15% · 500 words | p.41 | Drafted |
| R-05 | Local employment plan for the contract duration Section 6 · Social value | Scored | weight 10% | p.43 | Gap |
| R-06 | CAFM system integration — API details for the buyer's Concerto instance Section 7 · Technical | Mandatory | — | p.58 | Confirmed |
| R-07 | Fully-loaded rate card, split by trade and out-of-hours multiplier Section 8 · Pricing | Mandatory | — | p.71 | Not reviewed |
| R-08 | Response to Question 12 — Mobilisation plan Section 9 · Method statement | Word limit | weight 20% · 1000 words | p.88 | Drafted |
Static sample · sign up to run this on your own tender
Try it on a tender that’s on your desk today.
Free to start. No credit card. Upload one tender pack and see the same matrix generated against your own evidence.