Win more construction bids without a bigger bid team.
From PAS 91 PQQs and SQ2 forms to framework mini-competitions on Fusion21, Procure Partnerships and CCS — BidComplete marks up every requirement and drafts responses from your ISO evidence, past projects and method statements.

Familiar traps — with a way out.
Where Construction teams lose time
- SQ2 sections re-typed from scratch on every framework application
- ISO 45001 / 14001 / 9001 evidence scattered across drives and email
- Social value responses recycled verbatim — and scored down for it
- Case study library not mapped to the buyer's evaluation criteria
How BidComplete closes the gap
- PAS 91 and SQ2 questions pre-mapped to your standing responses
- Certifications and insurances marshalled per submission automatically
- Social value tailored to the buyer's TOMs and local priorities
- Comparable projects surfaced by value, sector and delivery method
How Construction teams use BidComplete.
Upload the ITT, PAS 91 or SQ2 pack
We parse the full document, extract every mandatory clause, scored question and evaluation weighting into a compliance matrix.
Match your evidence library
Certifications, method statements, past projects and CVs are matched to each requirement, with clear source citations.
Draft, review and export
First drafts in your voice, reviewer approvals logged, and a mandatory-blocking export so nothing gets submitted incomplete.
What's tuned for Construction.
PAS 91 & SQ2 patterns
Standing responses for the questions every UK construction buyer asks — kept current across your library.
ISO evidence auto-lookup
45001, 14001, 9001 and 27001 evidence attached to the right questions with certificate references.
Social value scoring
Responses aligned to the buyer's TOMs weightings and local economic priorities — not generic boilerplate.
Who's buying in construction.
The public-sector buyers most active in this sector, and how each of them tends to procure.
Central government departments
DfE, MoJ, MoD and Home Office estate — usually procured through CCS or dedicated capital works frameworks with heavy carbon and social value weighting.
Local authorities & combined authorities
Housing, highways, schools and regeneration — mostly through Fusion21, Procure Partnerships, Pagabo and LHC frameworks.
Housing associations & ALMOs
Planned and responsive maintenance, decarbonisation and new-build — Fusion21, Efficiency North and Consortium Procurement lead the market.
NHS estates & trusts
P22 New Hospital Programme, backlog maintenance and modular builds — procured through P22, ProCure23 and NHS SBS.
Universities & FE colleges
Estate refurbishment and net-zero retrofit — Southern Universities Purchasing Consortium and NEUPC frameworks.
Highways & transport bodies
National Highways, Network Rail and regional transport authorities — long-cycle frameworks with strong safety and carbon evaluation.
Common routes to market.
The frameworks and DPS agreements that matter most for construction suppliers today.
| Framework | Buyer / owner | Typical use |
|---|---|---|
| Fusion21 Building Fabric & Reactive Maintenance | Fusion21 | Planned works and responsive repairs for social housing landlords. |
| Procure Partnerships Major Works | Procure Partnerships | Regional major-works call-offs for local authorities and public bodies. |
| Pagabo Major Works | Pagabo | Public-sector new-build and refurbishment over £4m. |
| LHC Schools & Community Buildings | LHC Procurement Group | New-build and refurbishment for education and community estate. |
| P22 / ProCure23 | NHS England | Capital construction for NHS Trusts across England. |
| CCS Construction Works & Associated Services (RM6088) | Crown Commercial Service | National construction call-offs across the public sector. |
Where construction evaluators put the marks.
Typical evaluation splits for tenders in this sector. Individual buyers vary — but these ranges tell you where to invest your writing time.
Quality / method
50–70%Method statements, programme, mobilisation, health & safety and past performance carry most of the marks on works frameworks.
Price
20–40%Increasingly evaluated on whole-life cost and pre-construction fee percentages rather than headline tender sum.
Social value
10–20%TOMs-aligned employment, apprenticeship starts, local spend and carbon reduction — often ring-fenced with a minimum threshold.
What good looks like for UK construction bids in 2026.
The Building Safety Act and PPN 06/21's carbon reduction plan requirement have moved the goalposts on what a compliant construction bid even looks like. If your submission doesn't include a costed carbon reduction plan and a named Building Safety Act competence framework, it's non-compliant before evaluation begins on any contract over £5m.
PAS 91 is quietly being displaced by the Common Assessment Standard on many frameworks. Where a buyer still uses PAS 91, expect them to have added their own supplementary sections — a standing response library is only useful if it's tagged so you can pull the right variant for the right buyer.
Social value maturity has jumped. TOMs measures are now standard on nearly every works framework, and the winning bids commit to specific, addable numbers — apprenticeship starts by month, local SME spend percentage, tonnes of CO2 reduced — with a measurement and reporting cadence that survives contract audit.
Finally, buyers are getting sharper on mobilisation risk. A generic 90-day mobilisation Gantt no longer wins marks. Winning bids show the escalation route when a milestone slips, the named individuals responsible, and the buyer-side dependency they need cleared to hit each date.
Guides for construction bid teams.
Winning contracts with UK local authorities
How to position on Fusion21, Pagabo and Procure Partnerships mini-competitions.
Read guideWriting social value responses that actually score
TOMs-aligned commitments that survive contract-management review.
Read guidePrice-to-win for UK public-sector bids
Reading buyer history and framework award data before pricing a mini-competition.
Read guideQuestions from Construction bid teams.
Do you handle PAS 91 and the CCS Common Assessment Standard (SQ2)?
Yes. Both structures are pre-mapped so your standing responses re-flow into new submissions automatically, with any tender-specific additions flagged for review. When a buyer uses Constructionline Gold or Achilles BuildingConfidence in lieu of PAS 91, we mirror the mapping so you only maintain one evidence set.
How should we approach mini-competitions on Fusion21, Pagabo, LHC or Procure Partnerships?
Buyer history, previous winning suppliers on that lot, and price-to-win signals are surfaced alongside the requirement matrix so you can shape your bid before drafting. Most major-works mini-comps run 60/40 quality-to-price with a heavy method-statement weighting — invest there first.
What ISO and H&S accreditations are essentially mandatory for UK works tenders?
ISO 9001, 14001 and 45001 are baseline. Cyber Essentials is now standard for anything touching buyer IT. ISO 19650 (BIM) is required on most estate frameworks. CHAS, SafeContractor or Constructionline Gold usually cover the SSIP requirement. BidComplete auto-links current certificate references to the right questions.
How do PPN 06/21 carbon reduction plans work on construction tenders above £5m?
For central government contracts above £5m/year suppliers must publish a compliant Carbon Reduction Plan committing to net zero by 2050, signed off at board level. We store your CRP as a versioned artefact and cite the specific baseline year and scope 1/2/3 figures into the response.
How is social value scored on works frameworks?
TOMs-aligned employment starts, apprenticeships, local spend and carbon reduction are the highest-scoring measures. Most frameworks now set a 10–20% weighting with a minimum threshold — under-committing loses more marks than an ambitious-but-evidenced offer.
Can we bring across our existing case study and method-statement library?
Upload past bids, method statements and project sheets once. Every future draft draws from that library with citations back to the source PDF and page number so evaluators can trace the claim.
Does BidComplete handle NEC4 and JCT contractual response requirements?
Yes. NEC4 Options A–E and JCT D&B / IC clauses are recognised so contractual responses reference the correct clause numbers and risk allocation, not generic contract language.
How do we respond to Building Safety Act / competence questions on higher-risk buildings?
The BSA competence framework (PAS 8671/8672/8673) is pre-mapped. Your named duty-holders, competence records and gateway-2 experience are cited into the relevant sections without re-writing every submission.
Start your next construction bid
Upload a PAS 91, SQ2 or ITT pack. BidComplete will extract every mandatory clause, map your ISO evidence and past projects, and draft quality responses before your next review meeting.